top of page

Breadths 

1-    Acoustical Impact: 
The geothermal system is the proposed alternative system for the GCCIT building. Since the building is acoustically sensitive, changing the system to geothermal requires the change of the distribution system to heat pumps which might cause air and structure born noises. Therefore, an acoustical analysis will be performed to study the effect of the new system and to find solutions to reduce the noise that might be generated. 
2-    Construction management
The geothermal system proposed as an alternative system to the GCIT building will require instillation of the geothermal components in the west garden.  This will require planning, scheduling, logistics and cost analysis. Hence, an analysis will be performed to generate clear plans and schedules  for instillation. 
 

1.10.2017- Approved/ Updated Proposal
1.05.207 - Proposal
11.15.2016 - Tech Report 3
10.30.2016 - Abstract posted on CPEP
10.30.2016 - Abstract submitted on display board
10.27.2016 - Tech Report 2
10.23.2016 - Abstract Color and Content - Electronic Draft
10.19.2016 - Building Statistics Part 2 - Posted on CPEP
10.03.2016- Building Statistics Part 1 - Posted on CPEP
09.26.2016 - Tech Report 1
9.20.2016 - Resume Posted (Web Resume is Optional)
9.20.2016 - Bio Sketch Peer Review & Corrections
9.16.2016 - Bio Sketch Posted
9.12.2016 - CPEP Website - Full Menu Functional
9.13.2016 - Career Fair Hosting/ Event Assistanct Sign Up Complete
 9.07.2016- Building Statistics Part 1 - Electronic Draft
9.06.2016 - CPEP Home Page Draft
8.31.2016 - Mailed AE Dept. Thank You Letters to primary contacts 
8.29.2016 - Attended CPEP Seminar
8.26.2016 - Sent Personal Note or Thank You
8.26.2016 - Turned in Project Initiation Checklist Part 2
8.26.2016 - Turned in Project Initiation Checklist Part 1
8.09.2016 - Confirmed and/or Corrected Master List Information
6.20.2016 - Obtained Project Documentation (drawing, specs, etc.)
6.20.2016 - Owner Permission Received

NEWS    FEED

04.21.2017 Final CPEP REview 

AE 

AE Computer Labs

Call

T: 857-250-9941

Follow me

  • Facebook Clean
  • Twitter Clean
  • Google+ Clean

Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work‐in progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Hesham Gadah. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.

bottom of page