top of page

SUMMARY

The purpose of this report is to study the possibility of improving The Gira Center for Communication and Informational Technology building mechanical system by providing detailed study of the existing mechanical system and to propose different alternative systems.

Executive SUMMARY

Final Report 

1.10.2017- Approved/ Updated Proposal
1.05.207 - Proposal
11.15.2016 - Tech Report 3
10.30.2016 - Abstract posted on CPEP
10.30.2016 - Abstract submitted on display board
10.27.2016 - Tech Report 2
10.23.2016 - Abstract Color and Content - Electronic Draft
10.19.2016 - Building Statistics Part 2 - Posted on CPEP
10.03.2016- Building Statistics Part 1 - Posted on CPEP
09.26.2016 - Tech Report 1
9.20.2016 - Resume Posted (Web Resume is Optional)
9.20.2016 - Bio Sketch Peer Review & Corrections
9.16.2016 - Bio Sketch Posted
9.12.2016 - CPEP Website - Full Menu Functional
9.13.2016 - Career Fair Hosting/ Event Assistanct Sign Up Complete
 9.07.2016- Building Statistics Part 1 - Electronic Draft
9.06.2016 - CPEP Home Page Draft
8.31.2016 - Mailed AE Dept. Thank You Letters to primary contacts 
8.29.2016 - Attended CPEP Seminar
8.26.2016 - Sent Personal Note or Thank You
8.26.2016 - Turned in Project Initiation Checklist Part 2
8.26.2016 - Turned in Project Initiation Checklist Part 1
8.09.2016 - Confirmed and/or Corrected Master List Information
6.20.2016 - Obtained Project Documentation (drawing, specs, etc.)
6.20.2016 - Owner Permission Received

NEWS    FEED

04.21.2017 Final CPEP REview 
bottom of page